WEEK 12 Stage 2 · Hands-on lab 10 hours Field visit #3

Capstone B: Virtual Chilled-Water Plant

DELIVERABLE Virtual chilled-water plant demo

Week progress0%
Level 12 badge: CHW Plant

Learning objectives

  • >Integrate a simulated plant, control logic, BACnet/Modbus exposure, trends and tags into one system
  • >Write and test FDD rules with persistence and time delays
  • >Present technical results as a customer-facing case study

Sessions

Three 2-hour weeknight sessions plus a weekend block. Check each one off as you finish it.

Quiz

Score: 0 / 5 · aim for 4+

Answer in your notebook first, then reveal the answer and grade yourself honestly.

  1. Q1Write pseudo-code for an FDD rule that flags low loop DP while pumps run at full speed.

    [ reveal answer ]
    IF dp < dp_sp − tol AND all running pump speeds ≥ 98% FOR 15 min THEN alarm 'insufficient pump capacity or DP sensor fault'.
  2. Q2Why do FDD rules need time delays or persistence checks?

    [ reveal answer ]
    To avoid nuisance alarms during startups, staging and other transients.
  3. Q3Which two points does a 'commanded on, no status' rule need, and what are their point types?

    [ reveal answer ]
    A BO command and a BI status (or a network status point).
  4. Q4How would you describe the value of this demo to a building owner in one sentence?

    [ reveal answer ]
    For example: 'It keeps pressure where it's needed using the least pump energy, and it flags problems before occupants notice.'
  5. Q5Name two things that would change if you moved this lab onto a real Niagara or Metasys job.

    [ reveal answer ]
    Examples: vendor programming tools and licensing, real I/O and wiring, network design and security, graphics, commissioning, and owner training.

// PROGRAM CHECKPOINT

you can discover and command BACnet devices, write and tune control logic, read PLC code, and explain how data flows from sensor to front end to analytics.