WEEK 04 Stage 1 · Concepts 10 hours Field visit #1

Sequences of Operation (Guideline 36)

DELIVERABLE Chilled-water plant sequence, G36 comparison

Week progress0%
Level 4 badge: Sequences

Learning objectives

  • >Explain trim-and-respond reset and the role of requests in Guideline 36
  • >Describe AHU supply air temperature reset, static pressure reset and economizer logic
  • >Describe chilled-water plant pump staging, DP reset and minimum-flow bypass
  • >Write a plain-English sequence of operation and critique it against Guideline 36

Sessions

Three 2-hour weeknight sessions plus a weekend block. Check each one off as you finish it.

Quiz

Score: 0 / 5 · aim for 4+

Answer in your notebook first, then reveal the answer and grade yourself honestly.

  1. Q1Explain trim-and-respond in one sentence.

    [ reveal answer ]
    The setpoint is trimmed a little at regular intervals and raised (responds) when enough zones or valves report requests.
  2. Q2In Guideline 36, what generates a 'request' for a higher pump DP setpoint?

    [ reveal answer ]
    For example, a chilled-water valve that is nearly fully open (above about 95%) for a sustained period generates a pressure request.
  3. Q3Why does resetting duct static or loop DP save so much fan or pump energy?

    [ reveal answer ]
    Fan and pump power scale roughly with the cube of speed, and lower setpoints reduce throttling across valves and dampers.
  4. Q4In a primary-variable chilled-water plant, what is the minimum-flow bypass for?

    [ reveal answer ]
    It keeps chiller evaporator flow above the manufacturer's minimum.
  5. Q5Name one economizer problem that well-written sequences guard against.

    [ reveal answer ]
    Examples: high-limit lockout so warm outdoor air isn't used, coordination of the dampers with mechanical cooling, and freeze protection.

// DONE WHEN

// STRETCH (OPTIONAL)

Skim the OpenBuildingControl CEC report on why sequences fail in the field.