WEEK 04 Stage 1 · Concepts 10 hours
Field visit #1
Sequences of Operation (Guideline 36)
DELIVERABLE Chilled-water plant sequence, G36 comparison
Week progress0%
Learning objectives
- >Explain trim-and-respond reset and the role of requests in Guideline 36
- >Describe AHU supply air temperature reset, static pressure reset and economizer logic
- >Describe chilled-water plant pump staging, DP reset and minimum-flow bypass
- >Write a plain-English sequence of operation and critique it against Guideline 36
Sessions
Three 2-hour weeknight sessions plus a weekend block. Check each one off as you finish it.
Quiz
Score: 0 / 5 · aim for 4+
Answer in your notebook first, then reveal the answer and grade yourself honestly.
-
Q1Explain trim-and-respond in one sentence.
[ reveal answer ]
The setpoint is trimmed a little at regular intervals and raised (responds) when enough zones or valves report requests. -
Q2In Guideline 36, what generates a 'request' for a higher pump DP setpoint?
[ reveal answer ]
For example, a chilled-water valve that is nearly fully open (above about 95%) for a sustained period generates a pressure request. -
Q3Why does resetting duct static or loop DP save so much fan or pump energy?
[ reveal answer ]
Fan and pump power scale roughly with the cube of speed, and lower setpoints reduce throttling across valves and dampers. -
Q4In a primary-variable chilled-water plant, what is the minimum-flow bypass for?
[ reveal answer ]
It keeps chiller evaporator flow above the manufacturer's minimum. -
Q5Name one economizer problem that well-written sequences guard against.
[ reveal answer ]
Examples: high-limit lockout so warm outdoor air isn't used, coordination of the dampers with mechanical cooling, and freeze protection.
// DONE WHEN
// STRETCH (OPTIONAL)
Skim the OpenBuildingControl CEC report on why sequences fail in the field.